Stainless Process Pipework Installed in a 4 Hour Window, Merseyside

Willand Engineering completed a stainless process pipework project for a manufacturing site in Merseyside, providing a full site survey, measure, prefabrication and installation package.

Location
Merseyside
Site
Manufacturing site
Install window
4 hours
Result
First time fit

Project Overview

The works were planned around a strict 4 hour site installation window, meaning accuracy at survey and fabrication stage was critical.

Following the site survey, the pipework was measured, planned and prefabricated in our workshop, including stainless pipe runs, valve assemblies, flanged connections and welded sections. The completed pipework was then delivered to site and installed within the agreed window as a first-time fit solution.

Our scope included:

  • Site survey and measurement.
  • Pipework layout planning.
  • Off-site prefabrication.
  • Stainless process pipework manufacture.
  • Coded welding.
  • Valve and flange assemblies.
  • 4-hour site installation window.
  • First time fit solution.
  • QA support.

The Prefabrication Advantage

4hour site installation window

This approach reduced disruption to production, minimised hot works and site labour, and allowed the majority of fabrication and quality control to be completed off site in a controlled workshop environment.

By prefabricating the pipework before installation, we helped the customer reduce downtime while maintaining a high standard of weld quality, accuracy and stainless finish.