Case Study

Pipework Fabrication for Sewage Treatment Works, Supporting AMP8 Delivery

Willand Engineering completed the workshop fabrication and dye penetrant inspection of pipework assemblies for a sewage treatment works, supplied for installation by others.

Sector
Wastewater
Site
Sewage treatment works
Inspection
Dye penetrant (DPI)
Supply
Installation by others
Stainless steel pipework spools, bends and flanged connections fabricated by Willand Engineering for a sewage treatment works, loaded for delivery from the Halifax workshop
Completed pipework assemblies loaded for delivery from our Halifax workshop.

Project Overview

The pipework assemblies were fabricated in our Halifax workshop, including straight pipe sections, bends and flanged connections, ready for installation by the client's own site team.

Before leaving the workshop, welds were checked by dye penetrant inspection to identify any surface-breaking defects, so the completed assemblies arrived on site inspected and ready to fit.

Our scope included:

  • Fabrication of straight pipe sections.
  • Fabrication of bends.
  • Flanged connections.
  • Coded welding.
  • Dye penetrant inspection (DPI) of welds.
  • Supply of completed assemblies for installation by the client's site team.

Supporting AMP8 Delivery

DPIinspected welds before delivery

This project demonstrates our fabrication experience in wastewater applications and the support we can offer contractors delivering AMP8 pipework packages.

From our Halifax workshop, we provide bespoke design and fabrication, stainless and carbon steel pipework, and OEM manufacturing support, with nationwide supply.

6G coded welders  |  SafeContractor approved  |  Yorkshire based, nationwide cover

Planning a pipework package?

Send us your drawings, specifications and delivery requirements for a quotation.

Get in touch

Leave a Reply

Your email address will not be published. Required fields are marked *